Biomass Pellet Project under the National Bioenergy Programme by the Government of India. Here are some key points:
- Programme Approval:
- The National Bioenergy Programme is approved for the period from April 1, 2021, to March 31, 2026, with a budget outlay of ₹858 crore for Phase-I.
- It includes three sub-schemes: Waste to Energy Programme, Biomass Programme, and Biogas Programme.
- Budget Allocation:
- Waste to Energy Programme: ₹600 crore
- Biomass Programme: ₹158 crore
- Biogas Programme: ₹100 crore
- Exclusions:
- Bagasse-based Biomass Cogeneration projects are not supported under the Biomass programme.
- Eligibility and Assistance:
- The programme supports the setting up of Biomass Briquette/Pellet manufacturing plants and Biomass (non-bagasse) based cogeneration projects in industries.
- Central Financial Assistance (CFA) is provided as follows:
- ₹9 lakh per metric ton/hour (MTPH) manufacturing capacity for Briquette/Pellet manufacturing plants, with a maximum CFA of ₹45 lakh per plant.
- ₹40 lakh per MW for Biomass (non-bagasse) cogeneration projects, with a maximum CFA of ₹5 crore per project.
- Service Charges:
- Implementing agencies receive a service charge of 1% of the total CFA for processing applications.
- Performance inspection agencies receive service charges for monitoring and verification:
- ₹25,000 per MTPH (maximum ₹1 lakh per project) for Briquette/Pellet plants.
- ₹1 lakh/MW (maximum ₹5 lakh per project) for Biomass cogeneration projects.
- Conditions:
- Projects must use biomass like crop residues, wood from energy plantations, industrial wood waste, agro-based industrial residues, and forest residues.
- Municipal solid waste, black liquor, slop, press mud, and other processed industrial waste are not eligible.
- Minimum plant sizes are 1 MTPH for Briquette/Pellet plants and 0.5 MW for Biomass cogeneration plants.
- Proposals must be submitted before commissioning the projects.
- Procedure for Availing CFA:
- Proposals should be submitted through the BioURJA Portal.
- “In-principle” approval is required for projects, with specific conditions for projects with and without loans.
- The commissioning of the plant should occur within specified time frames after receiving “in-principle” approval.
- Performance inspection must be conducted within 18 months of commissioning.
- Implementing Agency:
- The Indian Renewable Energy Development Agency Limited (IREDA) is the implementing agency.
- Guidelines and Appendices:
- Detailed guidelines for the implementation of the Biomass Programme are provided in the document.
Here are the detailed conditions for the setup of a biomass pellet manufacturing plant according to the document:
Terms and Conditions
- Eligible Biomass Types:
- Crop residues such as paddy straw, wheat straw, mustard stalks, and cotton stalks.
- Wood from energy plantations (e.g., prosopis juliflora).
- Weeds, palm leaves, coconut shells, and husk.
- Wood waste from industrial operations (e.g., sawdust, off cuts, bark).
- Agro-based industrial residue (e.g., rice husk, barley husk).
- Forest residues such as pine needles, branches, and stems of trees.
- Eligible Projects:
- Only projects for setting up briquette/pellet manufacturing plants and biomass (non-bagasse) cogeneration projects are eligible.
- Bagasse-based cogeneration projects are not eligible.
- Projects using municipal solid waste, black liquor, slop, press mud, and other processed industrial waste are not considered.
- Eligibility Criteria:
- Companies registered under the Companies Act, Partnership Firms, Proprietorship Firms, Cooperatives, Public Sector Companies, and Government-owned Firms are eligible for financial support.
- Minimum project/plant size requirement:
- Briquette/Pellet Manufacturing Plant: 1 MTPH (metric tons per hour).
- Biomass (non-bagasse) Cogeneration Power Plant: 0.5 MW.
- Financial Assistance and Application:
- Central Financial Assistance (CFA) will be provided after successful commissioning and performance inspection of the plant.
- Proposals for availing CFA should be submitted before the commissioning of the projects, except for specific cases mentioned in the document.
- CFA should not be claimed from any other Ministry or department of the Central Government for the proposed plant.
- Only projects installing new machinery (e.g., briquette/pellet making machinery, boiler, turbine) are eligible for CFA.
- Safety and Statutory Requirements:
- Measures should be taken to ensure the safety of stored biomass.
- Necessary statutory clearances must be obtained from appropriate Central/State Government bodies before establishing or commissioning the plant.
- The plant should share generation data with the Ministry of New and Renewable Energy (MNRE) or any designated agency through the installation of SCADA/remote monitoring system.
- Biomass (non-bagasse) cogeneration plants should not utilize any fossil fuel.
- Other Conditions:
- The project should not be dislocated or dismantled without prior information to the Ministry.
- The Ministry reserves the right to access project-related data for publishing success stories, case studies, technical papers, and for third-party inspection and evaluation of the project’s operation and performance aspects.